ColumbiaMagazine.com
Printed from:

Welcome to Columbia Magazine  
 



































 
State Budget 2004-2006: Columbia appears destined to be major highway hub


Bypass, new Interchange with LBN Parkway, Highway 61 from LBN to Sparksville, and Federal projects on Heartland Parkway and Route 66 give Columbia new importance on Highway system

Adair County may have fared better in the 2004-2006 State Budget than ever before in history, many observers are saying. They compare the number of projects to the days of Governor Louie B. Nunn, a previous high mark for Adair County.

Much of the talk has centered around the major highway projects and the bypass construction and the construction of the interchange at the Louie B. Nunn Parkway and Highway 61 south. Those projects, plus the Federal Route 66 and Heartland Parkways, mean Columbia is destined to be a major highway hub.


For many who have been waiting a half-a-century to see the bypass, it is still not believeable, but 51st District (Adair, Taylor) Representative Russ Mobley, (R) Campbellsville, KY, says that this time it's happening. "The money is here. The projects are in Stage 5, the Construction Stage. The bulldozers need to be out and the work needs to be done."

Mobley noted that highway projects have five stages: 1) Planning, 2) Design, 3) Right of Way, 4) Utility, and 5) Construction.
Rep. Russ Mobley will be in the Annex Basement, Tuesday, March 15, 10:00 A.M, CST, to discuss items that were included in the 2004-2006 State Budget for Adair County. Everyone is invited.
Three major projects total $51 million

The biggest projects are in Stage 5, Construction. They are:
  • New Interchange at Highway 61 South and the Louie B. Nunn. It is in the $13 million has been allocated for this project, Rep. Moberly said.
  • The Columbia Bypass: This project is let in two sections, one at $10 million, the other $12 million. Both projects are in Stage 5, or Construction Stage.
  • Kentucky 61 Project: Sparksville to Louie B. Nunn Parkway. $19 million has been allocated, and it is also in Stage 5 or Construction Phase.
City, County, get additional road funds

Additional road funds which will be available for immediate (next 2 years) use in Adair County and the City of Columbia are:
  • $483,368 to the Adair County Fiscal Court for general road repair. The Fiscal Court will select the projects and apply to the Transportation Cabinet for approval. "This money," Rep. Moberly said, "is in addition to regular county funds allocated to the county."
  • $54,000 to the City of Columbia for street projects. The City Council will select the projects, apply to the Transportation Cabinet for approval, and then the projects can be done. This money, also, is in addition to regular state aid for streets.
New bridge over Ky 80 east, get $950,000

A project to replace the existing bridge over Russell Creek, 1.2 miles East on KY 80, received $950,000 in the budget. It is in the Right-of-Way and Utility Phase. The project is slated to get an additional $2.5 million when the 2006 State Budget is drafted, Representative Mobley said.

Other, smaller, highway projects are in budget

Rep. Mobley said that several other projects included in the budget need to be noted. They are:
  • Reconstruction of a dangerous section of KY 704, 10 miles south, Which includes the curvy Dug Hill, (once locally called Insurance Hill by locals) received $300,000 for right-of-way and utilities stages.
  • A project to build a bridge over Brush Creek on Hwy 5289 has been allocated $100,000. It is in the budget for the project, which is in the Design Stage (Stage 2)
  • A bridge project over Casey Creek, at 6.4 miles on S. 1742, is also in Stage 2, the Design Stage. $170,000 has been allocated to this phase.
  • A replacement bridge project for Cedar Creek, 1.6 miles east on Highway 55, has rceived a $65,000 allocation. It is in the construction Stage, Stage 5.
Rep. Mobley comments on Heartland Parkway progress

It's a Federal project, but $11,000,000 has been approved by the U.S. House of Representatives to upgrading Highway 55 to widen it, add passing lanes every three miles, and make it a part of the Heartland Parkway, a 61 mile road which will extend from the Louie B. Nunn Parkway at it's intersection with Highway 61 to the Martha Layne Collins, or Bluegrass Parkway.

Representative Mobley said the Heartland project appears to be a go. "I talked with Representive Ron Lewis this yesterday, and he expects the U.S. Senate to approve the project, too."

A major section of the Route 66 project, hoped to extend one day from Washington, DC, to Los Angeles, CA, has been announced for the South Side of Somerset, from Fishing Creek Hill on the Louie B. Nunn on the West, to a point east of Somerset on KY 80.


To contact Rep. Mobley:
  • email: rusmobley@alltel.net
  • Phone: Home: 270-465-6436; Office at Campbellsville University: 270-789-5266; Frankfort Office: 888-887-0088
  • Postal Address: Rep. Russ Mobley, 900 Holly, Campbellsville, KY 42718


  • This story was posted on 2005-03-14 17:12:48
    Printable: this page is now automatically formatted for printing.
    Have comments or corrections for this story? Use our contact form and let us know.



 

































 
 
Quick Links to Popular Features


Looking for a story or picture?
Try our Photo Archive or our Stories Archive for all the information that's appeared on ColumbiaMagazine.com.

 

Contact us: Columbia Magazine and columbiamagazine.com are published by Linda Waggener and Pen Waggener, PO Box 906, Columbia, KY 42728.
Phone: 270.403.0017


Please use our contact page, or send questions about technical issues with this site to webmaster@columbiamagazine.com. All logos and trademarks used on this site are property of their respective owners. All comments remain the property and responsibility of their posters, all articles and photos remain the property of their creators, and all the rest is copyright 1995-Present by Columbia Magazine. Privacy policy: use of this site requires no sharing of information. Voluntarily shared information may be published and made available to the public on this site and/or stored electronically. Anonymous submissions will be subject to additional verification. Cookies are not required to use our site. However, if you have cookies enabled in your web browser, some of our advertisers may use cookies for interest-based advertising across multiple domains. For more information about third-party advertising, visit the NAI web privacy site.